Calendar

  1. Luna 1 (februarie 2002) - Raport D1 (din T4.1, WP4 - leader AMS) - Report of end-users requirements - 7.7 %.
  2. Luna 3 (aprilie 2002) - Raport D4 (din T3.1, WP3 - leader IMEC) Report on interface format to the CAD environment - 2 %.
  3. Luna 4 (mai 2002) - Raport D5 (din T2.1, WP2 - leader PHILIPS) Report on existing and new order reduction methods - 21 %
  4. Luna 15 (aprilie 2003) - Raport D8 (din T1.1 si T1.2 - leader LMN) Report on the usability and adaptaton of FIT to solve the field-problem - 18.5 %.
  5. Luna 15 (aprilie 2003) - Demonstrator D11 (din T2.2 - leader PHILIPS) Demonstrator of order reduction modules 21%.
  6. Luna 28 (mai 2004) - Raport D16 (din T4.4 - leader AMS) Report on the benchmarking of currently available tools - 7.5 %.
  7. Luna 30 (iulie 2004) ¯ Raport D18 (din T5.1 si T5.3 - leader IMEC) Dissemination and use plan - 19 %.