- Luna 1 (februarie 2002) - Raport D1 (din T4.1, WP4 - leader AMS) -
Report of end-users requirements - 7.7 %.
- Luna 3 (aprilie 2002) - Raport D4 (din T3.1, WP3 - leader IMEC)
Report on interface format to the CAD environment - 2 %.
- Luna 4 (mai 2002) - Raport D5 (din T2.1, WP2 - leader PHILIPS)
Report on existing and new order reduction methods - 21 %
- Luna 15 (aprilie 2003) - Raport D8 (din T1.1 si T1.2 - leader LMN)
Report on the usability and adaptaton of FIT to solve the field-problem -
18.5 %.
- Luna 15 (aprilie 2003) - Demonstrator D11 (din T2.2 - leader
PHILIPS) Demonstrator of order reduction modules 21%.
- Luna 28 (mai 2004) - Raport D16 (din T4.4 - leader AMS)
Report on the benchmarking of currently available tools - 7.5 %.
- Luna 30 (iulie 2004) ¯ Raport D18 (din T5.1 si T5.3 - leader IMEC)
Dissemination and use plan - 19 %.